Hope City Church – The Woodlands

Project: Hope City Church – The Woodlands Role: Construction Manager Scope: This 25,000 square foot transformation of an existing two-story church included mechanical, electrical, plumbing and elevator upgrades and all new finishes. The exterior modifications included new canopies, paving, landscaping, storm water detention and refinishing of the existing exterior masonry walls. Architect: Gensler Value: $4,200,000 […]

Zion Lutheran Church

Project: Zion Lutheran Church Role: Construction Manager at Risk Scope: The construction of a new 14,000 square foot addition to Zion Lutheran Church. This 138 year old church in need of a large Worship/Multipurpose Facility to better serve its growing and younger congregation. The project also included a major expansion of the site parking as […]

Pearland Chinese Church

Project: Pearland Chinese Church Role: General Contractor Scope: New construction of a 13,000 square foot one-story church. The project included site work, parking area, landscaping and detention pond. The interior elements of the building consisted of a large multi-purpose area for worship and gatherings with an adjacent kitchen including food service equipment. Architect: RH Architects […]

BridgePoint Bible Church

Project: BridgePoint Bible Church Role: General Contractor Scope: Renovation of approximately 56,000 square feet of building area including the commons and multi-purpose hall. These highly used spaces, which flooded during Hurricane Harvey are integral to the church’s functionality, meant scheduling and material expediting was paramount. Architect: Ray-Hollington Architects, Inc. Value: $6,400,000 Impact: For over eighty […]

St. John Vianney Catholic Church

Project: St. John Vianney Catholic Church Role: Construction Manager at Risk Scope: This project was a renovation of the existing 17,000 square foot Catholic Church which included the Sanctuary, Narthex, and Chapel. It also features new construction of a bell tower and paved walkways with brick archways connecting the existing features to the additions.  Construction […]

Jewish Family Services

Project: Jewish Family Services Role: General Contractor Scope: This project included new construction of a 11,000 square foot community center. The facility consists of a kosher training kitchen, administrative offices, therapy suites and space for the Jewish Family Services disability service, Celebration Company. Architect: Gensler Value: $3,000,000 Impact: Founded in 1913, Jewish Family Services provides […]

First Church of Pearland

Project: First Church of Pearland Role: General Contractor Scope: This ground-up construction of a 24,000 square foot Youth Ministry Building included a full-service commercial kitchen, cafe, classroom, children’s worship center and three large youth ministry centers. Architect: LIVE Design Group Value: $3,800,000 Impact: First Church exists to see lives changed by the power of God’s […]

Memorial Drive Presbyterian Church

Project: Memorial Drive Presbyterian Church Role: Construction Manager Scope: This project included new construction of a columbarium and renovations to the main sanctuary, public corridors and library at Memorial Drive Presbyterian Church. The columbarium won the 2014 Faith & Form/IFRAA award for design, developed by Merriman Holt Architects. Architect: Merriman Holt Architects Value: $5,400,000 Impact: […]

Star of Hope – Children’s Building

Project: Star of Hope – Children’s Building Role: Construction Manager Scope: Acting as Construction Manager, the Forney team was hired to coordinate and manage the construction of the new Children’s Place building. The challenge of the project was to safely construct this new three story building in the heart of their active campus, which provided […]